How To Install Flange Electromagnetic Flow Meter?

Date: May, 6th, 2026
From: Lin Xing
Electromagnetic Flow meters are normally used in measuring the flow of conductive liquid in the closed pipeline, after you ordered the flow meters, we will delivery the instruments to you within 3~5 working days, please check the procedures and instructions below after you receive the magnetic flow meter.
Please note that when delivering the instruments to the installation field. Please use the elevator belt when delivering the flange type flow meter (≤DN 450[18”]) and fix the position with the two flanges. Chains are forbidden due to abrading the housings.
1. Choosing the place where no motors, no transformers are nearby, powerful electromagnetic wave may generate electrical interference.
2. When measuring a mixed-phase medium, the flow meters shouldn’t be mounted on someplace where the mixed-phase is separating.
3. When the environment temperature is between -25 °C~ + 60 °C, direct sunlight is better to be avoided.
4. Install the place where is free from vibration or little vibration, if strong vibration exists, fix support is required before and after the flow meter.
5. Temperature humidity should be within 5% ~9%
6. Direct raining and immersion should be avoided.

Pic 1. Electromagnetic flowmeter’s installation.
Please check the video below of how to install the electromagnetic flow meter, it’s more easier for you to understand.
视频连接
If you’re interested in our electromagnetic flow meter, you can subscribe our website to get more updates on time! And if you still have questions or suggestions about our flowmeters, please feel free to contact us. We are ready to help you!